New Website Designs Launch Dec. 19 at 12 p.m.
We are excited to announce that our district and school websites will be undergoing a design update on Thursday, Dec. 19, at 12 p.m. This update is expected to take about an hour, so our websites will be temporarily down during that time. Additionally, following the update, site visitors may need to clear their browser cache to fully access the new website design in its first few hours.
 
The design update will modernize our websites and make them even easier to navigate for our community, as well as to update for our staff. The new websites also synchronize with ParentSquare, making it easier to share important communications from ParentSquare to the website with just a click of a button.
150 DeWitt Clovis, CA 93612  |  P: (559) 327-8300  | F: (559) 327-8390

Impact of Facility Bonds

Home  \  About  \  Impact of Facility B...

The Impact of Facility Bonds at Our School

“Maximizing Achievement for All Students,” means making sure that every school, no matter when it was built, is a high-quality learning environment where students can do their best.

Over time, our school has benefited from community support of facility bond measures in many ways, allowing us to continue to have a modern, well-maintained campus equitable to other schools around Clovis Unified.

Measure A is on the November 2024 ballot. If passed, it will provide our school with:
  1. •MPR Modernization
  2. •Roof Replacement
  3. •Safety Enhancements
  4. •AV Technology Improvements
  5. •LED Lighting Upgrades
Since 2012, Weldon Elementary School has received the following projects funded by two Measure A facility bonds:
  • Updated multipurpose room
  • Expanded and reconfigured kitchen and staff dining to include storage, equipment and ancillary spaces
  • Expanded kindergarten to include workroom and storage
  • Replaced ventilation system in a classroom wing
  • Replaced ceilings and added energy efficient lighting
  • Repaired interior finish work campus wide
  • Repaired playfields and irrigation systems and added water-saving time clocks
  • Replaced flooring
  • Repaired and upgraded main power distribution system
  • Implemented efficiency lighting improvements
  • Upgraded classroom audio-visual systems
  • Upgraded technology network and wireless access
  • Added security cameras
  • Replaced plumbing fixtures and upgraded restrooms
  • Completed Americans with Disabilities Act (ADA) required upgrades

Every school facility in Clovis Unified has benefited from bond projects not once or twice, but many times over. Across the District, bond funds have been used for:
  • Fixing leaking roofs, electrical wiring, fire safety doors and smoke alarms
  • Repairing and upgrading deteriorating science, engineering and math classrooms to provide modern learning spaces at all of our schools
  • Building new schools and adding space at existing schools to reduce overcrowding
  • Building new performing arts and athletic spaces and upgrading others
  • Making needed updates to facilities to provide safe, clean drinking water
  • Improving school safety and security by updating communication systems and security systems
  • Maintaining equitable facilities at schools of all ages through modernization and maintenance projects
  • And many, many other upgrades and repairs

Many people don’t realize that as of 2024, our community has a lower tax rate on school bonds than it did in 2020, 2010 or even 2000. They also don’t know that Clovis Unified residents pay a lower tax rate than people living in neighboring school districts like Fresno, Sanger and Central. Learn more about our facilities program and the use of facility bonds in Clovis Unified at www.cusd.com/Facilities.aspx
Clovis Unified School District: Be the best you can be in mind, body, and spirit
Buchanan Area Schools
Buchanan link image Alta Sierra link image Cole link image Century Elem logo with "C" and Tiger Dry Creek link image Garfield Elementary Logo Tarpey link image Woods link image
Clovis High Area Schools
Clovis High link image Clark link image Cedar Wood link image Clovis Elementary link image Mickey Cox link image Gettysburg link image Jefferson link image Red Bank link image Sierra Vista link image Weldon link image
Clovis West Area Schools
Clovis West link image Kastner link image Ft. Washington link image Liberty link image Lincoln link image Maple Creek Nelson link image Pinedale link image Valley Oak link image
Clovis North Area Schools
Clovis North link image Bud Rank link image Copper Hills Fugman link image Mountain View link image River View link image
Clovis East Area Schools
Clovis East wolf logo Freedom link image Miramonte link image Oraze link image Reagan Elementary link image
Clovis South Area Schools
TBEC Logo Boris Chargers logo Fancher Creek Logo Hirayama Logo TK Logo Young logo
Educational Services Area Schools
CART link image Gateway link image Clovis Online School link image Clovis Community Day School link image Clovis Adult Education link image Sierra Outdoor link image
View text-based website